Project delivery

ACAMS ensures seamless and efficient project management, design, integration and deployment.

ACAMS airport detail 5- ACAMS airport detail 4- Photo: Gaute Bruvik

Project Management

To ensure a streamlined and timely delivery of an ACAMS system, we appoint a project manager for all delivery contracts. Our project managers are highly qualified and have extensive experience with airport tower systems worldwide. The project manager serves as the single point of contact for the customer throughout the entire contract duration.

Design

A key factor in the successful delivery of an airport tower system is the accurate analysis of functional and interface requirements. Our engineers possess comprehensive knowledge of the various subsystems associated with the tower and are familiar with many different makes and models. This expertise ensures that the requirements for an ACAMS solution are accurately determined early in the project.

Integration

The ACAMS product interfaces and integrates multiple subsystems into a single user interface, making system integration a crucial part of the delivery. Our engineers have extensive knowledge and experience in this area, ensuring proper operation when integrated with associated subsystems. We also have the capability to deliver integrated third-party systems to provide a complete turnkey tower solution.

Deployment

For ATC/ATM deployments in airport towers, we offer services tailored to customer requirements. We can provide turnkey deliveries, including all necessary expertise and manpower. Alternatively, if the customer has available manpower, we can provide engineering expertise to support the customer’s team during the deployment.

To ensure our customers can effectively utilize and maintain their systems, we offer comprehensive operational and maintenance training.

AFL-Cairo_FAT_2014_ACAMS

What we deliver:

  • Effective deployment of project management;
    ACAMS applies combined project managers / deployment engineers for optimal customer contact and project knowledge
  • Cost effective adaptability;
    Systems are configurable for wide system flexibility
  • Use of local technical infrastructure installation resources

Airport control tower in Tromsø, Norway

“Everything delivered in time although there were many sites to serve within a very short time. Important replacements recommended in relation to life expectancy which save extra expenses in the nearest future.” Jarle Ostad, Avinor Flysikring AS (Norway)

See our references

See our solutions